All Legislation
Ordinance2830-2026Council Office for Signature
To authorize the Director of Columbus Water and Power to enter into a professional engineering services contract with Black and Veatch Corporation for the Lower Olentangy Tunnel Phase 2 project; to authorize the appropriation of funds within the Sanitary Revolving Loan Fund; to authorize this contract to be funded with a loan from the Water Pollution Control Loan Fund; to make this ordinance contingent upon the Ohio Water Development Authority approving a loan for this project; and to authorize the expenditure of up to $4,595,036.43 from the Sanitary Revolving Loan Fund for the contract. ($4,595,036.43)
Progress
✓
Introduced
Oct 5, 2026
✓
In Committee
Nov 2, 2026
3
Passed
4
Enacted